How to use the plastic paver mold ?

News 2024年4月17日 174

How to use the plastic paver mold ?

Zhengzhou LYA Group Co.,Ltd. is the manufacture of the plastic paver mold,very professional on this field.

Some customers are in contact with the secondary industry for the first time. There will be some ignorance of the use of products. Today we will make a brief introduction to the use of the product:

1. The first step is to choose materials, the specific raw material ratio, and which one is better for raw materials. Customers can communicate with the salesperson when placing an order.

2. Stir in the material ratio informed by the sales staff and stir the raw materials evenly.

Stir more than 10 minutes.

3. Pour the stirred raw materials into the plastic paver mold, and then shake for 10-15 seconds to vibrate the bubbles in the concrete.

4. Send the plastic paver mold that fills in the concrete to the drying room to keep the indoor temperature 50 degrees, and it can be removed for 10-15 hours.

5. After the release, the floor tiles should be stored in the warehouse for more than 7 days. It can be sprayed with water.

During the customer’s use of the product, if you have any operations that do not understand, you can communicate with the salesperson at any time. Our company will provide a complete text description and video to assist customers to better understand the product and understand the use of the product to help customers produce out the production Better products.

Customers in need, welcome your consultation at any time, and look forward to cooperation with you.